Location: Surrey BC
Floor Area: 157,000 sf.
Construction Cost: $53M
Taylor Kurtz, in association with Roundwaith Dick + Hadley Architects were commissioned to design the new Central Works Yard and Operations Centre for the City of Surrey, British Columbia.
The facility consists of three distinct new buildings:
1. A 95,000sf East Operations Centre comprised of a four storey Administration and Operations Block and a single storey Workshops and Support Facilities Block.
2. A 14,000sf North Storage / Warehouse Building providing general purpose storage and loading space for the Engineering, Civic Facilities and Parks Departments.
3. A 48,000sf West Fleet Maintenance Building including Vehicle Maintenance Bays, Related Shops, Main Stores, Small Tools Repair, Parts and Tools Storage and the Pumps and Controls Shop.